Go to content
      * Media
      * Contact us
    Search Search
        Close Search on HS2
          Search

          Some suggestions

            * HS2
            * Route Map
            * What is HS2
      * What is HS2
      * Route map
      * Building HS2
      * Supply chain
      * Careers
      * About us
      News Media blogs Media gallery Contact us

        News

          Search
          Search

        News Releases Found 859

      Pre-2017 HS2 press releases are available on GOV.UK/HS2

            * HS2 to install beams on M42 ‘twin box’

              17 Jun 2026
                  + B-roll footage and images show the twin box being built over the M42
                  + Complex installation will require four weekend carriageway closures
                  + The first closure affects the M42 J5A to 7 northbound, ​and J6 to 7 southbound. The closure is from 9pm on Friday, 26th June to 5am on Monday, 29th June 2026
                  + Drivers are encouraged to plan ahead and follow approved diversion routes

            * Bolton-based Booth Industries begins manufacturing HS2 tunnel cross-passage doors

              28 May 2026
                  + View and embed a new video showing the cross-passage doors being manufactured in Bolton and the first test installation within the Chiltern tunnel
                  + Download new images of the safety doors doors being manufactured and the first test-installation in the Chilterns tunnel

            * HS2 viaducts to be installed over busy motorways in major milestone

              18 May 2026
                  + Motorists given advanced warning of M6 and M42 works between June and November
                  + Number of motorway closures reduced to minimise disruption, with diversion routes put in place
                  + HS2 works with National Highways, Birmingham Airport and NEC to coordinate motorway programme
                  + B-roll footage shows progress on HS2's construction works around the motorway network
                  + New images show progress on the Water Orton viaducts and the twin box structure, which will be extended over the motorway

            * HS2 celebrates completion of tallest bridge ahead of complex launch operation

              13 May 2026
                  + New images and video released today show the fully assembled bridge
                  + Engineers prepare for the three-stage operation to launch the 4,200-tonne structure into position over the Birmingham – Lichfield railway line
                  + Link to new B-roll footage showing the completed structure from different angles https://vimeo.com/1191546022/eabc972a66?share=copy&fl=sv&fe=ci

            * High-tech HS2 train depot and control centre deal provides jobs boost for Birmingham

              11 May 2026
                  + Download images showing how the high-tech Rolling Stock Depot and Network Integrated Control Centre will look once complete, what the site looks like now, and recent drone footage of the site at Washwood Heath, Birmingham.
                  + Around a thousand permanent jobs expected to be created at the depot and land freed up for development around the edges of the 70-hectare brown-field site. Plus around 500 construction jobs during the build of the facility.
                  + Contract award comes as HS2 undergoes a comprehensive reset to ensure the project is delivered efficiently and to the lowest reasonable cost.

            * HS2 to start work on new improved Saltley Viaduct

              28 Apr 2026

                HS2 engineers are ready to start a major construction programme in Saltley, two miles northeast of Birmingham city centre, to facilitate the arrival of new high-speed rail services.

        Pagination

            * 1
            * 2
            * 3
            * 4
            * 5
            * …
            * Next
            * Last

    Follow us

      * Follow us on X (external)
      * Find us on Facebook (external)
      * Connect with us on LinkedIn (external)
      * Find us on Instagram (external)
      * Find us on Threads (external)
      * Find us on YouTube (external)
      * HS2 on GOV.UK
      * Considerate Constructors
      * Modern slavery and human trafficking
      * Publication scheme
      * Accessibility statement
      * Cookie policy
      * Cookie settings
      * Sitemap

        Birmingham

        Two Snowhill
        Snow Hill Queensway
        Birmingham
        B4 6GA

        London

        The Podium Euston
        1 Eversholt Street
        London
        NW1 2DN

    Copyright © High Speed Two (HS2) Limited 2026
